National Coastal Access – Progress in North West England April 2016

Natural England have produced their monthly update for April 2016 summarising the progress being made on delivery of coastal access in the North West. Stretch 1 (Allonby to Whitehaven) and stretch 2 (Whitehaven to Silecroft) remain open whilst stretch 3 (Gretna to Allonby) and stretch 4 (Walney Island) remain in the development phase. Work is also starting on Stretches 5 and 6 (Silecroft to Silverdale and Silverdale to Cleveleys). A series of drop in sessions has been arranged re the Silecroft to Silverdale section – see the download below.

 

The April 2016 update can be downloaded below:

Download “NW Coastal Access update April 2016”

North-West-Coastal-Access-Monthly-Update-April-2016.pdf – Downloaded 763 times – 264.02 KB

Drop in sessions have also been arranged by Natural England in the North West. Details can be downloaded below:

Download “Drop in sessions NW Coastal Access”

NE-Drop-in-sessions-NW-Coastal-access.jpg – Downloaded 674 times – 206.04 KB

If you would like to get these updates direct please contact: [email protected]

Natural England have also issued an England Coastal Path Update for March which shows progress across England. This can be downloaded below:

Download “England Coastal Path March 2016”

Nat-Stkhlr-Eng-Coast-Path-Monthly-Update-March-16-Final.pdf – Downloaded 687 times – 186.05 KB

Tags: , , ,