Coastal protection work near Silloth

Coastal protection work has now been successfully completed on a vulnerable area of the Solway Coast. The scheme, on the B5300 Maryport to Silloth road, has seen A 280 metre length of Rock Armour installed to protect the sand and gravel bank on which the important B5300 Maryport to Silloth coastal road runs between Mawbray and Beckfoot.  Further details are available via this link.

Tags: , , , ,